Website Language:
en-US/ur-PK
'
Organization

SYSTEM AUGMENTATION PROGRAM (SAP)

criteria

  • Reduction in energy losses (< 3%).
  • Reduction in voltage drop (< 5%).
  • Improvement in quality of supply.
  • Improvement in system reliability.
  • Plan facilities for future load growth.
  • Reduction in cost of operation & maintenance.
  • Cost/benefit economic consideration.

AIMs

  • Decrease the current flow (KWH units receipts) through rehabilitation of H.T & L.T Network.
  • To increase the KWH Units Sale by :-
    • Replacing old and defective meters
    • Installation of check meters at distribution transformers
    • Increasing the frequency of checking of connections by officers.

Computer Software Used For Load Flow Studies

  • Feeder Analysis (FDRANA)
  • Power System Simulator For Advance Distribution Engineering Productivity Tool (PSS/ADEPT) for simulation of existing H.T/L.T network for load flow studies and proposed H.T/L.T network for future planning.
  • Power System Simulator(PSS) for Transmission System load flow studies.
       Copyright © 2014 LESCO. All right reserved. Designed by SoftVerx.com