| Tariff
A - I General Supply |
|
Sr. No. |
Tariff Category/Particulars |
Fixed Charges Rs/K.W/M |
Variable Charges (Rs/KWh) |
| a) |
For Sanctioned Load up to 5
KW |
|
|
| i |
Up to 50 Units |
- |
1.40 |
| |
For Consumption exceeding 50
Units |
|
|
| ii |
1-100 Units |
- |
3.49 |
| iii |
101-300 |
- |
5.26 |
| iv |
301-700 |
- |
8.51 |
| v |
above 700 Units |
- |
10.00 |
| b) |
For Sanctioned load exceeding
5 kw |
|
|
| |
Time of Use |
- |
Peak |
Off-Peak |
| 9.76 |
5.96 |
|
Note : Under this tariff, there shall be minimum monthly
customer charge at the following rates even if no energy is consumed.
a) Single Phase connections: Rs. 75/- per consumer per month
b) Three phase connection: Rs.150/- per consumer per month
|
| |
| Tariff
A -2 General Supply |
|
Sr. No. |
Tariff Category/Particulars |
Fixed Charges Rs/K.W/M |
Variable Charges (Rs/KWh) |
| a) |
For Sanctioned load upto 5 KW |
|
10.4 |
| b) |
For Sanctioned load exceeding 5 KW |
315 |
6.49 |
| c) |
Time of Use |
315 |
Peak |
Off-Peak |
| 9.17 |
5.6 |
|
Note : Under this tariff, there shall be
minimum monthly customer charge at the following rates even if no
energy is consumed. a) single phase connections Rs. 175/- per consumer
per month b) Three phase connections: Rs. 350/- per consumer per
month |
| |
| Tariff
B - Industrial Supply |
|
Sr. No. |
Tariff Category/Particulars |
Fixed Charges Rs/K.W/M |
Variable Charges (Rs/KWh) |
| B1 |
upto 5 KW (at 400/230 volts) |
- |
7.50 |
| B2(a) |
6-500 KW (at 400 Volts) |
315 |
6.05 |
| |
Time of Use |
|
Peak |
Off-Peak |
| B2(b) |
6-500 KW (at 400 Volts) |
315 |
9.17 |
5.60 |
| B3 |
For All Loads up to 5000kw (at 11,33 KV) |
305 |
8.84 |
5.08 |
| B4 |
For All Loads (at 66,132 kv & above) |
295 |
8.52 |
4.76 |
| For B1 consumers there shall be fixed
minimum charge of Rs.350 per Month For B2 consumers there shall be
fixed minimum charge of Rs.2,000 per Month For B3 consumers there
shall be fixed minimum charge of Rs.50,000 per Month For B4 consumers
there shall be fixed minimum charge of Rs.500,000 per Month
|
| |
| Tariff
C - Bulk Supply |
|
Sr. No. |
Tariff Category/Particulars |
Fixed Charges Rs/K.W/M |
Variable Charges (Rs/KWh) |
| C-1 |
for supply at 400/230 Volts |
|
|
|
| a) |
Sanctioned Load up to 5 KW |
- |
7.91 |
| b) |
Sanctioned Load above 5 KW & up to 500 KW |
315 |
7.29 |
| C-2 (a) |
For supply at 11,33 KV up to and including 5000KW |
305 |
6.91 |
| C-3(a) |
For supply at 66 KV and & above and sanctioned
load above 5000KW |
295 |
6.78 |
| |
Time Of Use(Optional) |
|
Peak |
Off-Peak |
| C-1 (c) |
For supply at 400/230 volts above 5 KW &
up to 500 KW |
315 |
9.02 |
5.51 |
| C-2 (b) |
for supply at 11,33KV up to and including 5000KW |
305 |
8.70 |
5.00 |
| C-3 (b) |
For supply at 66 KV & above and sanctioned
load above 5000 KW |
295 |
8.38 |
4.69 |
| |
| Tariff
D - Agriculture |
|
Sr.No. |
Tariff Category/Particulars |
Fixed Charges Rs/K.W/M |
Variable Charges (Rs/KWh) |
| D-1 (a) |
SCARP less than 5 KW |
- |
6.75 |
| D-2 |
Agriculture Tube wells |
90 |
4.00 |
| |
|
|
Peak |
Off-Peak |
| D-1 (b) |
SCARP and Agriculture more than 5 KW |
315 |
7.61 |
3.42 |
|
Note: The consumers having sanctioned load
less than 20 KW can opt for TOU metering. |
| |
| Tariff
E - Temporary Supply |
|
Sr. No. |
Tariff Category/Particulars |
Fixed Charges Rs/K.W/M |
Variable Charges (Rs/KWh) |
| E-1 (i) |
Residential Supply |
- |
10.00 |
| E-1 (ii) |
Commercial Supply |
- |
10.50 |
| E-2 |
Industrial Supply |
- |
7.50 |
| Note : For the categories of E-1(i&ii)
above, the minimum bill of the consumers shall be Rs. 50/- per day
subject to a minimum of Rs. 500/- for the entire period of supply,
even if no energy is consumed. |
| |
| Tariff
F - Seasonal Industrial Supply |
| 125% of relevant
Industrial Tariff |
| Note: Tariff F
consumers will have the option to convert to regular tariff and
vice versa. This option can be exercised at the time of a new connection
or at the beginning of the season.Once exercised, the option remains
in force for at least one year. |
| |
| Tariff
G - Public Lighting |
|
Sr. No. |
Tariff Category/Particulars |
Fixed Charges Rs/K.W/M |
Variable Charges (Rs/KWh) |
| |
Street Lighting |
- |
10.2 |
|
There shall be a minimum monthly charge
of Rs. 500/- per month per KW of lamp capacity installed. |
| |
| Tariff
H - Residential Colonies attached to Industries |
|
Sr. No. |
Tariff Category/Particulars |
Fixed Charges Rs/K.W/M |
Variable Charges (Rs/KWh) |
| |
Residential Colonies attached
to industrial premises |
- |
9.17 |
| |
| Tariff I -Railway Traction |
| Sr. No. |
Tariff Category/Particulars |
Fixed Charges Rs/K.W/M |
Variable
Charges (Rs/KWh) |
| |
Railway Traction |
- |
7.5 |
| |
| Tariff K - Special
Contractors |
|
Sr. No. |
Tariff Category/Particulars |
Fixed Charges Rs/K.W/M |
Variable Charges (Rs/KWh) |
| 1 |
Azad Jammu & Kashmir |
295 |
3.36 |
| |
|
|
Peak |
Off Peak |
| |
Time Of Use |
295 |
9.24 |
5.11 |
| 2 |
Rawat Lab |
- |
6.97 |