a. The total amount recovered from sponsors shall
remain with the executing agency to arrange for timely
procurement of the material.
b. WAPDA shall fulfill its commitments for completion
of the construction work according to the schedule finalized
with the sponsoring agency.
c. Committee Members:
- S.E (O)
- Manager Construction
d. If sponsoring agency intends to get the job executed
in phases, the cost for the proposed phases may be recovered as
and when their execution is requested, but the energization shall
only be allowed when the entire system is constructed or the entire
cost for the project is deposited. No escalation will be charged
by WAPDA at any later stage.
e. Consultant shall also be associated by the committee
so as to satisfy the sponsors for quality of the work and use of
material as per estimate.
f. Regular reporting shall be made by the committee.
7. One Point BulkSupply
- The system beyond the metering point shall be maintained and
operated by the sponsor agency.
- While energizing the metering system at one point, the material
purchase documents, invoices shall be examined to ensure that the
legitimate material has been used in the scheme. Material shall be
purchased from the WAPDA approved manufacturers.
8. Recovery Of Sharing Cost Of Grid Station
- No matter the grid is new or existing, sharing cost shall be recovered
from all sponsors/ residents.
- Rs. 4.93 Million per MW of Ultimate demand of load as cost of
grid station and transmission line (5km) and Rs. 0.534 Million per
MW as cost of land (Rs. 2732 per KW including the cost of Land).
Rs. 2465 per KW if land provided by sponsor.
- 50% lump sum amount shall be paid by the sponsors in advance.
- 25% from the plot owners at the time of giving new connections.
- 25% shall be borne by WAPDA.
- Govt. Sponsored Housing Schemes shall provide 4 to 6 acres of
land free of charges for construction of Grid station to WAPDA.
- No delay will be made after the deposit of amount.
- Total cost of feeder(s) and other distribution system shall also
be provided by the sponsor.
- It has been assumed that the sponsors will provide 4-6 acres of
suitable land free of cost for the construction of new grid. Alternatively
they’ll bear the actual cost of the land.
9- Connected Load Specifications For Different
Sizes Of Plots
Two Kanals
a. Light Points = 90 * 100 = 9 KW
b. Ceiling Fans = 15 * 80 = 1.2 KW
c. Exhaust Fans = 06 * 80 = 0.48 KW
d. Ordinary Plug = 25 * 100 = 2.50 KW
TOTAL = 13.18 KW
Max Demand with 30 % D.F = 13.180 * 0.30 = 3.954
KW
Load with 100 % Demand Factor
a. A.Cs = 04 * 2.5 = 10 KW
b. Iron = 02 * 1.0 = 2 KW
Total Demand = 3.954 + 10 + 2 = 16 KW
One Kanals
a. Light Points = 60 * 100 = 6 KW
b. Ceiling Fans = 10 * 80 = 0.8 KW
c. Exhaust Fans = 03 * 80 = 0.24 KW
d. Ordinary Plug = 15 * 100 = 1.50 KW
Total = 08.54
KW
Max Demand with 30 % D.F = 8.54 * 0.30 = 2.562
KW
Load with 100 % Demand Factor
a. A.Cs = 02 * 2.5 = 5 KW
b. Iron = 01 * 1.0 = 1 KW
Total Demand = 2.562 + 5 + 1 = 9 KW
10 Marlas
a. Light Points = 30 * 100 = 3 KW
b. Ceiling Fans = 06 * 80 = 0.48 KW
c. Exhaust Fans = 03 * 80 = 0.24 KW
d. Ordinary Plug = 10 * 100 = 1.00 KW
Total = 4.72 KW
Max Demand with 30 % Demand Fctor = 4.72 * 0.30 = 1.416
KW
Load with 100 % Demand Factor
a. A.Cs = 01 * 2.5 = 2.5 KW
b. Iron = 01 * 1.0 = 1.0 KW
Total Demand = 1.416 + 2.5 + 1 = 5 KW
5 Marlas
a. Light Points = 15 * 100 = 1.50
KW
b. Ceiling Fans = 05 * 80 = 0.40 KW
c. Exhaust Fans = 02 * 80 = 0.16 KW
d. Ordinary Plug = 05 * 100 = 0.50 KW
e. Power Plug = 01 * 1000 = 1.00 KW
Total = 3.56 KW
Max Demand with 30 % D.F = 3.56 * 0.30 = 1.068
KW
Load with 100 % Demand Factor
a. Iron = 01 * 1.0 = 1.0 KW
Total Demand = 1.068 + 1 = 2 KW
3 Marlas
a. Light Points = 12 * 100 = 1.20
KW
b. Ceiling Fans = 05 * 80 = 0.40 KW
c. Exhaust Fans = 02 * 80 = 0.16 KW
d. Ordinary Plug = 05 * 100 = 0.50 KW
e. Power Plug = 01 * 1000 = 1.00 KW
Total = 3.26 KW
Max Demand with 30 % D.F = 3.26 * 0.30 = 0.978
KW
Load with 100 % Demand Factor
a. Iron = 01 * 1.0 = 1.0 KW
Total Demand = 0.978 + 1 = 2 KW
Commercial Centers
Sr. No. Description Load/Sq. Ft
(KW)
1- Banks, Office Bldg 5
2- Barber Shop & Beauty Parlour 4
3- School, Mosque, Dwelling 3
3- Shops, Hospitals, Court Rooms, 2
Restuarants, Hotels & Motels
4- Lodge Rooms, 1.5
5- Churches, Amories, Auditoriams 1
6- Garages, Corridors 0.5
7- Ware House Storage 0.25
Fan Load
2 Watt/Sq. Ft.
Air Conditioning Load
8 Watts/Sq. Ft.
Other Appliances Like T.V, Refrigerators
2 Watts/Sq. Ft.