STATUS OF WORK (2011-2012)
STATUS OF WORKS DURING 01/07/2011 TO 30/11/2011
LOAN
DETAIL OF WORKS
LINE
Completed
LINE
Re-Conducted
TRANSFORMER
Installed
TRANSFORMER
AUGMENTED
Received at the end of 30/06/2009
Received during the year
Total
Completed
H.T. K.M
L.T K.M
H.T. K.M
L.T. K.M
25 KVA
50 KVA
100 KVA
200 KVA
400 KVA
25 to 50 KVA
50 to 100 KVA
100 to 200 KVA
LT PROPOSAL
DOP/1073
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
IBRD-3764
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ELR
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ADB-824
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SAP
920
154
1074
171
47.534
80.009
-
47.257
1
29
97
19
-
1
13
13
TOTAL (A)
920
154
1074
171
47.534
80.009
0.000
47.257
1
29
97
19
0
1
13
13
HT FEEDER
DOP/1073
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
IBRD-3764
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ELR
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ADB-824
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SAP
111
20
131
0
62.765
-
0.631
-
-
-
-
-
-
-
-
-
TOTAL (B)
111
20
131
0
62.765
0.000
0.631
0.000
0
0
0
0
0
0
0
0
TOTAL (A+B)
1031
174
1205
171
110.299
80.009
0.631
47.257
1
29
97
19
0
1
13
13