ELECTRICAL ASSETS : GRID SYSTEM TRANSFORMERS
IN RESPECT OF SS&T DIVISION (NORTH) LESCO SHALAMAR LAHORE FOR THE
MONTH OF MARCH 2013
| Sr.
No. |
Name
of
Grid Station |
TRF
Code |
Ratio
in KV |
Capacity
in MVA |
Ampere |
Date
of
Commissioning |
Make |
1 |
132KV Attabad |
T-1 |
132/11 |
40 |
2008 |
14.06.12 |
Siemens |
T-2 |
132/11 |
20/26 |
1305 |
25.5.05 |
HEC |
T-3 |
132/66 |
40 |
350 |
17.09.80 |
ELTA |
T-4 |
132/11 |
20/26 |
1305 |
31.08.09 |
HEC |
2 |
132KV Ayesha |
T-1 |
132/11 |
20/26 |
1305 |
26.11.05 |
HEC |
T-2 |
132/11 |
20/26 |
1305 |
10.7.05 |
HEC |
3 |
132KV Badami Bagh |
T-1 |
132/11 |
40 |
2008 |
18.01.2010 |
Siemens |
T-2 |
132/11 |
40 |
2008 |
28.9.2010 |
Siemens |
T-3 |
132/11 |
20/26 |
1305 |
16.5.07 |
Irfan Transfo |
4 |
132KV Bata Pur |
T-1 |
132/11 |
20/26 |
1305 |
8.2.85 |
Maidensha |
T-2 |
132/11 |
20/26 |
1305 |
23.05.85 |
Maidensha |
T-3 |
132/11 |
20/26 |
1305 |
29.4.07 |
Iran Transfo |
5 |
132KV Bhogiwal |
T-1 |
132/11 |
40 |
2008 |
6.5.09 |
Siemens |
T-2 |
132/11 |
40 |
2008 |
14.4.10 |
Siemens |
T-3 |
132/11 |
20/26 |
1305 |
28.2.02 |
Siemens |
T-4 |
132/11 |
20/26 |
1305 |
11.7.05 |
HEC |
6 |
132KV Bucheki |
T-1 |
132/66 |
40 |
350 |
31.01.82 |
ELTA |
T-2 |
132/11 |
20/26 |
1305 |
11.7.2000 |
Electroputer |
T-3 |
132/11 |
20/26 |
1305 |
29.11.2010 |
Electroputer |
7 |
132KV Bhatti Gate |
T-1 |
132/11 |
40 |
2008 |
20.9.10 |
Siemens |
T-2 |
132/11 |
40 |
2008 |
29.4.09 |
Siemens |
8 |
132KV Bhikki |
T-1 |
132/11 |
20/26 |
1305 |
26.6.03 |
Siemens |
T-2 |
132/11 |
20/26 |
1305 |
31.10.06 |
H.E.C |
T-3 |
132/11 |
20/26 |
1305 |
13.04.2012 |
China |
9 |
132KV Chah Miran |
T-1 |
132/11 |
40 |
2008 |
24.9.2010 |
Siemens |
T-2 |
132/11 |
40 |
2008 |
19-2-09 |
PEL |
10 |
132KV Daroghawala |
T-I` |
132/11 |
40 |
2008 |
8.3.2010 |
SIEMENS |
T-2` |
132/11 |
20/26 |
1305 |
18.11.2009 |
SIEMENS |
11 |
132KV Fateh Garh |
T-1 |
132/11 |
40 |
2008 |
16.9.2010 |
Siemens |
T-2 |
132/11 |
40 |
2008 |
11.8.08 |
Siemens |
T-3 |
132/11 |
20/26 |
1305 |
20.08.2001 |
Siemens |
12 |
132KV Fort |
T-1 |
132/11 |
20/26 |
1305 |
13.10.90 |
Toshiba |
T-2 |
132/11 |
20/26 |
1305 |
04.03.80 |
T/Union |
13 |
132KV Farooqabad |
T-1 |
132/11 |
20/26 |
1305 |
08.12.93 |
China |
T-2 |
132/11 |
20/26 |
1305 |
26.02.91 |
E/Putter |
T-3 |
132/11 |
20/26 |
1305 |
10.06.08 |
H E C |
14 |
132KV Green View |
T-1 |
132/11 |
20/26 |
1305 |
28.4.2001 |
Siemens |
T-2 |
132/11 |
20/26 |
1305 |
13.01.90 |
Hundai |
T-3 |
132/11 |
40 |
2008 |
30.07.09 |
Siemens |
T-4 |
132/11 |
20/26 |
1305 |
30.9.2010 |
Siemens |
15 |
132KV Ghazi New |
T-I |
132/11 |
40 |
2008 |
24.4.2009 |
PEL |
T-2 |
132/11 |
40 |
2008 |
10.1.2011 |
HEC |
T-3 |
132/11 |
40 |
2008 |
26.8.09 |
Siemens |
T-4 |
132/11 |
10/13 |
653 |
19.2.09 |
HEC |
16 |
132KV Ittehad Chemical |
T-3 |
132/11 |
10/13 |
653 |
09.10.77 |
ELTA |
17 |
132KV ICI Public |
T-1 |
132/11 |
20/26 |
1305 |
09.01.99 |
ELTA |
T-2 |
132/11 |
20/26 |
1305 |
21.10.03 |
Siemens |
18 |
132KV Khanqah Dogran |
T-1 |
132/11 |
20/26 |
1305 |
28.10.10 |
Siemens |
T-2 |
132/11 |
20/26 |
1305 |
10.02.10 |
Siemens |
19 |
132KV Mcleod Road |
T-1 |
132/11 |
40 |
2008 |
19.07.09 |
Siemens |
T-2 |
132/11 |
40 |
2008 |
24.4.2011 |
Siemens |
20 |
132KV Mochi Gate |
T-1 |
132/11 |
20/26 |
1305 |
23.02.95 |
China |
T-2 |
132/11 |
20/26 |
1305 |
22.4.07 |
Iran Transfo |
21 |
132KV Narang |
T-1 |
132/11 |
10/13 |
653 |
24.4.84 |
Brown Boveri |
T-2 |
132/11 |
10/13 |
653 |
18.7.2000 |
Elprom |
22 |
132KV Nankana |
T-1 |
132/11 |
20/26 |
1305 |
14.11.2010 |
Toshiba |
T-2 |
132/11 |
20/26 |
1305 |
20.5.08 |
HEC |
23 |
132KV P.W.R. |
T-1 |
132/11 |
20/26 |
1305 |
4.4.05 |
HEC |
T-2 |
132/11 |
40 |
2008 |
31.10.2011 |
HEC |
T-3 |
132/11 |
31.5 / 40 |
2008 |
13.12.2009 |
Siemens |
24 |
132KV Rustam |
T-1 |
132/11 |
20/26 |
1305 |
13.08.85 |
Toshiba |
T-2 |
132/11 |
20/26 |
1305 |
13.08.85 |
Toshiba |
T-3 |
132/66 |
30/37.5 |
328 |
8.12.99 |
Siemens |
T-4 |
132/11 |
20/26 |
1305 |
9.07.09 |
Siemens |
25 |
132KV Shahdara New |
T-1 |
132/11 |
40 |
2008 |
30.3.2010 |
Siemens |
T-2 |
|
20/26 |
1305 |
9.7.94 |
E/Putter |
T-3 |
132/11 |
20/26 |
1305 |
7.6.07 |
Iran Transfo |
26 |
132KV Shahdara Scarp |
T-1 |
132/11 |
10/13 |
653 |
13.5.04 |
Hundai |
T-2 |
132/11 |
10 |
502 |
07.02.2005 |
Energoinvest |
27 |
132KV Shamkey |
T-1 |
132/11 |
20/26 |
1305 |
12.12.87 |
Hundai |
T-2 |
132/11 |
20/26 |
1305 |
12.12.87 |
Hundai |
T-3 |
132/11 |
40 |
2008 |
12.8.2010 |
Siemens |
T-4 |
132/11 |
20/26 |
1305 |
30.01.2012 |
China |
28 |
132KV Sharaqpur |
T-1 |
132/11 |
20/26 |
1305 |
3.12.2010 |
Siemens |
T-2 |
132/11 |
20/26 |
1305 |
9.9.10 |
ELTA |
29 |
132KV Sharaqpur Road SKP |
T-1 |
132/11 |
20/26 |
1305 |
25.9.2010 |
ELTA |
30 |
132KV Shalamar |
T-1 |
132/11 |
20/26 |
1305 |
14.09.97 |
ELTA |
T-2 |
132/11 |
20/26 |
1305 |
17.12.77 |
Savglanio |
T-3 |
132/11 |
20/26 |
1305 |
06.05.93 |
ELTA |
31 |
132KV Shalamar -II |
T-1 |
132/11 |
20/26 |
1305 |
28.11.07 |
Siemens |
T-2 |
132/11 |
20/26 |
1305 |
10.6.06 |
Iran Transfo |
T-3 |
132/11 |
20/26 |
1305 |
19.4.08 |
Elprom |
32 |
132KV Sunny View |
T-1 |
132/11 |
20/26 |
1305 |
9.10.85 |
ELTA |
T-2 |
132/11 |
31.5 / 40 |
2008 |
27.1.2011 |
HEC |
33 |
132KV Shah Kot |
T-1 |
132/11 |
20/26 |
1305 |
22.07.88 |
Ganz |
T-2 |
132/11 |
20/26 |
1305 |
29.04.98 |
E/Putter |
T-3 |
132/11 |
20/26 |
1305 |
23.02.2012 |
HEC |
34 |
132KV Sheikhupura |
T-2 |
132/11 |
20/26 |
1305 |
05.10.87 |
ELTA |
T-3 |
132/11 |
20/26 |
1305 |
16.8.07 |
Siemens |
T-4 |
132/11 |
20/26 |
1305 |
05.05.94 |
Siemens |
35 |
132KV Shekhupura Indust. |
T-I |
132/11 |
10/13 |
653 |
19.3.05 |
Elprom |
T-2 |
132/11 |
10/13 |
653 |
25.11.05 |
Electroputer |
36 |
132KV Warburton |
T-1 |
132/11 |
20/26 |
1305 |
6.9.10 |
Hyundai |
T-2 |
132/11 |
20/26 |
1305 |
12.05.93 |
E/Putter |
37 |
132KV Walgan Sohial |
T-1 |
132/11 |
20/26 |
1305 |
18.07.2002 |
Siemens |
T-2 |
132/11 |
20/26 |
1305 |
11.9.2008 |
ANSALDO |
38 |
66KV Ali Juj |
T-1 |
66/11 |
10/13 |
653 |
20.01.1981 |
EnergoElprom |
T-2 |
66/11 |
10/13 |
653 |
5.5.2011 |
EnergoElprom |
39 |
66KV EMCO |
T-1 |
66/11 |
10/13 |
653 |
23.06.78 |
ELTA |
T-2 |
66/11 |
10/13 |
653 |
25.6.78 |
Elprom |
T-3 |
66/11 |
10/13 |
653 |
27.10.04 |
Elprom |
40 |
66KV Malik Pur |
T-1 |
66/11 |
10/13 |
653 |
29.03.84 |
Elprom Energo |
T-2 |
66/11 |
10/13 |
653 |
20.9.03 |
Redconcor |
41 |
66KV Mohlan |
T-1 |
66/11 |
10/13 |
653 |
21.05.97 |
O.E.L,ITALY |
42 |
66KV Sangla Hill |
T-1 |
66/11 |
10/13 |
653 |
28.10.81 |
Elprom |
T-2 |
66/11 |
10/13 |
653 |
19.03.2012 |
ELTA |
43 |
66KV U.I.S. |
T-1 |
66/11 |
10/13 |
653 |
23.06.72 |
Elprom |
44 |
132KV Mobile |
T-6 |
132/11 |
15/20 |
1003 |
18.08.2009 |
Iran Transfo |
IN RESPect OF SS&T DIVISION (SOUTH) LESCO KOT LAKHPAT LAHORE FOR
THE MONTH OF MARCH 2013
| Sr.
No. |
Name
of
Grid Station |
TRF
Code |
Ratio
in KV |
Capacity
in MVA |
Ampere |
Date
of
Commissioning |
Make |
| 1 |
132KV Allama Iqbal Town |
T-1 |
132/11 |
31.5/40 |
2008 |
15.04.2010 |
SIEMENS |
T-2 |
132/11 |
31.5/40 |
2008 |
29.09.2011 |
SIEMENS |
T-3 |
132/11 |
20/26 |
1305 |
13.07.2001 |
China |
| 2 |
132KV A.W.T |
T-1 |
132/11 |
20/26 |
1305 |
16.04.2010 |
H.E.C |
| 3 |
132KV Bahia Peru |
T-1 |
132/11 |
20/26 |
1305 |
11.11.1984 |
MAIDENSHA |
T-2 |
132/11 |
20/26 |
1305 |
31.07.1982 |
Asia Leper |
T-3 |
132/11 |
20/26 |
1305 |
04.05.1991 |
E/Putter |
T-4 |
132/11 |
20/26 |
1305 |
01.09.2012 |
TBEA CHINA |
| 4 |
132KV Chak-65 |
T-1 |
132/11 |
20/26 |
1305 |
08.04.2001 |
SIEMENS |
T-2 |
132/11 |
20/26 |
1305 |
30.10.2002 |
H.E.C |
T-3 |
132/11 |
20/26 |
1305 |
22.01.2011 |
Toshiba |
T-4 |
132/11 |
20/26 |
1305 |
23.06.2007 |
Iran Transfo |
| 5 |
132KV Chung |
T-1 |
132/11 |
20/26 |
1305 |
18.12.2007 |
China |
T-2 |
132/11 |
31.5/40 |
2008 |
11.11.2010 |
H.EC |
T-3 |
132/11 |
20/26 |
1305 |
05.01.2007 |
SIEMENS |
T-4 |
132/11 |
20/26 |
1305 |
29.10.2011 |
TBEA CHINA |
| 6 |
132KV Chunian |
T-1 |
132/11 |
20/26 |
1305 |
01.10.2010 |
HYUNDAI |
T-2 |
132/11 |
20/26 |
1305 |
01.04.2008 |
PEL |
| 7 |
132KV Defence |
T-1 |
132/11 |
20/26 |
1305 |
17.01.1987 |
Toshiba |
T-2 |
132/11 |
31.5/40 |
2008 |
18.09.2010 |
SIEMENS |
T-3 |
132/11 |
31.5/40 |
2008 |
30.06.2010 |
H.E.C |
| 8 |
132KV DHA-1 (V & VI) |
T-1 |
132/11 |
20/26 |
1305 |
06.05.2009 |
SIEMENS |
T-2 |
132/11 |
20/26 |
1305 |
23.06.2011 |
TOSHIBA |
| 9 |
132KV Depalpur |
T-1 |
132/11 |
20/26 |
1305 |
26.05.1993 |
E/Putter |
T-2 |
132/11 |
20/26 |
1305 |
16.06.2004 |
SIEMENS |
T-3 |
132/11 |
20/26 |
1305 |
17.09.2009 |
SIEMENS |
| 10 |
132KV Ellahabad |
T-1 |
132/11 |
20/26 |
1305 |
19.05.2011 |
TBEA CHINA |
T-2 |
132/11 |
20/26 |
1305 |
07.07.2008 |
H.E.C |
| 11 |
132KV Garden Town |
T-1 |
132/11 |
20/26 |
1305 |
27.09.1987 |
ELTA |
T-2 |
132/11 |
31.5/40 |
2008 |
22.05.2011 |
H.E.C |
T-3 |
132/11 |
31.5/40 |
2008 |
31.12.2009 |
SIEMENS |
T-4 |
132/11 |
20/26 |
1305 |
23.05.2006 |
Iran Transfo |
| 12 |
132KV Gulshan-e- Ravi |
T-1 |
132/11 |
31.5/40 |
2008 |
12.11.2006 |
SIEMENS |
T-2 |
132/11 |
31.5/40 |
2008 |
17.04.2010 |
SIEMENS |
| 13 |
132KV Haveli Lakha |
T-1 |
132/11 |
20/26 |
1305 |
19.06.2008 |
Iran-Transfo |
T-2 |
132/11 |
20/26 |
1305 |
19.12.2000 |
Minel |
T-3 |
132/11 |
20/26 |
1305 |
04.05.2012 |
SIEMENS |
| 14 |
132KV Hujra Shah Muqeem |
T-1 |
132/11 |
20/26 |
1305 |
28.06.2008 |
HEC |
T-2 |
132/11 |
20/26 |
1305 |
12.12.2010 |
HEC |
| 15 |
132KV Johar Town |
T-1 |
132/11 |
31.5/40 |
2008 |
01.11.2010 |
SIEMENS |
T-2 |
132/11 |
31.5/40 |
2008 |
25.03.2010 |
SIEMENS |
T-3 |
132/11 |
20/26 |
1305 |
04.10.2006 |
HEC |
T-4 |
132/11 |
20/26 |
1305 |
15.05.2008 |
PEL |
| 16 |
132KV Kasur |
T-1 |
132/11 |
20/26 |
1305 |
15.11.1981 |
ELTA |
T-2 |
132/11 |
31.5/40 |
2008 |
30.11.2010 |
SIEMENS |
T-3 |
132/11 |
20/26 |
1305 |
25.05.1995 |
China |
T-4 |
132/11 |
20/26 |
1305 |
13.08.2005 |
ELTA |
| 17 |
132KV Kasur New |
T-1 |
132/11 |
20/26 |
1305 |
20.08.2010 |
SIEMENS |
T-2 |
132/11 |
20/26 |
1305 |
19.04.2012 |
ASEA LEPPER |
| 18 |
132KV Kahna Nau |
T-1 |
132/11 |
20/26 |
1305 |
14-11-2011 |
HEC |
T-2 |
132/11 |
20/26 |
1305 |
04.01.2012 |
IRAN-TRANSFO |
T-3 |
132/11 |
20/26 |
1305 |
11.06.2012 |
ELTA Poland |
| 19 |
132KV Khuddian |
T-1 |
132/11 |
20/26 |
1305 |
29.12.2002 |
H.E.C. |
T-2 |
132/11 |
20/26 |
1305 |
06.03.2007 |
ELTA |
T-3 |
132/11 |
20/26 |
1305 |
14.07.2009 |
Electroputer |
| 20 |
132KV Kot Radha Kishan |
T-1 |
132/11 |
10/13 |
653 |
08.10.2002 |
ELPROM |
T-2 |
132/11 |
20/26 |
1305 |
23.07.2008 |
H.E.C. |
| 21 |
132KV Lefo |
T-1 |
132/11 |
20/26 |
1305 |
10.08.2011 |
SIEMENS |
T-2 |
132/11 |
20/26 |
1305 |
10.08.1984 |
Maidensha |
T-3 |
132/11 |
20/26 |
1305 |
28.05.2006 |
Iran-Transfo |
| 22 |
132KV Lahore Cantt: |
T-1 |
132/11 |
20/26 |
1305 |
12.03.2007 |
H.E.C. |
T-2 |
132/11 |
20/26 |
1305 |
27.06.2007 |
SIEMENS |
| 23 |
132KV Lullyani |
T-1 |
132/11 |
20/26 |
1305 |
25.08.2009 |
H.E.C |
T-2 |
132/11 |
20/26 |
1305 |
13.01.2010 |
SIEMENS |
| 24 |
132KV Manga Mandi |
T-1 |
132/11 |
20/26 |
1305 |
25.05.2011 |
SIEMENS |
T-2 |
132/11 |
20/26 |
1305 |
31.03.2006 |
Iran-Transfo |
T-3 |
132/11 |
20/26 |
1305 |
12.02.2007 |
HEC |
| 25 |
132KV Model Town |
T-1 |
132/11 |
31.5/40 |
2008 |
29.07.2010 |
SIEMENS |
T-2 |
132/11 |
20/26 |
1305 |
26.01.1989 |
Hundai |
T-3 |
132/11 |
20/26 |
1305 |
12.12.2007 |
SIEMENS |
T-4 |
132/11 |
20/26 |
1305 |
02.05.2007 |
Iran- Transfo |
| 26 |
132KV Old Kot Lakhpat |
T-1 |
132/11 |
31.5/40 |
2008 |
22.04.2010 |
SIEMENS |
T-2 |
132/11 |
31.5/40 |
2008 |
21.01.2007 |
SIEMENS |
T-3 |
132/11 |
20/26 |
1305 |
23.07.2001 |
SIEMENS |
RT-1 |
132/25 |
7.5 |
300 |
19.12.2003 |
Bursh |
| 27 |
132KV Okara City-I |
T-1 |
132/66 |
32.2 |
282 |
17.12.1992 |
C.G.E. |
T-2 |
132/11 |
31.5/40 |
2008 |
26.10.2010 |
SIEMENS |
T-3 |
132/11 |
20/26 |
1305 |
24.07.2012 |
Shen Yang |
| 28 |
132KV Okara City-II |
T-1 |
132/11 |
20/26 |
1305 |
16.02.2008 |
PEL |
T-2 |
132/11 |
31.5/40 |
2008 |
09.03.2010 |
SIEMENS |
| 29 |
132KV Okara Cantt: |
T-2 |
132/11 |
20/26 |
1305 |
08.10.2010 |
Iran- Transfo |
| 30 |
132KV Pattoki |
T-1 |
132/11 |
20/26 |
1305 |
10.06.2008 |
Iran-Transfo |
T-2 |
132/11 |
20/26 |
1305 |
02.11.2002 |
E/Putter |
| 31 |
132KV Qurtaba |
T-1 |
132/11 |
31.5/40 |
2008 |
11.04.2012 |
SIEMENS |
T-2 |
132/11 |
31.5/40 |
2008 |
08.02.2011 |
SIEMENS |
T-3 |
132/11 |
31.5/40 |
2008 |
31.03.2010 |
SIEMENS |
| 32 |
132KV Raiwind |
T-1 |
132/11 |
31.5/40 |
2008 |
23.07.2011 |
H.E.C |
T-2 |
132/11 |
20/26 |
1305 |
01.10.2001 |
China |
T-3 |
132/11 |
20/26 |
1305 |
28.05.2007 |
Iran- Transfo |
| 33 |
132KV Raiwind New |
T-1 |
132/11 |
20/26 |
1305 |
25.06.2010 |
SIEMENS |
| 34 |
132KV Rehman Park |
T-1 |
132/11 |
20/26 |
1305 |
11.03.1983 |
Ansaldo |
T-2 |
132/11 |
31.5/40 |
2008 |
15.03.2011 |
SIEMENS |
T-3 |
132/11 |
31.5/40 |
2008 |
11.07.2010 |
SIEMENS |
| 35 |
132KV Rewaz Garden |
T-1 |
132/11 |
31.5/40 |
2008 |
21.12.2010 |
Iran- Transfo |
T-2 |
132/11 |
31.5/40 |
2008 |
03.12.2006 |
SIEMENS |
| 36 |
132KV Renala Khurd |
T-1 |
132/11 |
20/26 |
1305 |
07.03.2008 |
Iran- Transfo |
T-2 |
132/11 |
20/26 |
1305 |
21.07.2011 |
TBEA CHINA |
T-3 |
132/11 |
20/26 |
1305 |
23.10.2012 |
TOSHIBA |
| 37 |
132KV Sadar Gogera |
T-1 |
132/11 |
20/26 |
1305 |
30.12.2010 |
E/Putter |
T-2 |
132/11 |
20/26 |
1305 |
24.12.2010 |
Iran-Transfo |
| 38 |
132KV Said Pur |
T-1 |
132/11 |
31.5/40 |
2008 |
02.10.2010 |
SIEMENS |
T-2 |
132/11 |
20/26 |
1305 |
20.09.1993 |
Shen Yang |
T-3 |
132/11 |
31.5/40 |
2008 |
12.10.2012 |
SIEMENS |
| 39 |
132KV Sabzazar |
T-1 |
132/11 |
20/26 |
1305 |
18.03.2007 |
H.E.C.(Pak:) |
T-2 |
132/11 |
20/26 |
1305 |
08.12.2007 |
Iran Transfo |
T-3 |
132/11 |
20/26 |
1305 |
28.07.2008 |
H.E.C |
| 40 |
132KV Shadman |
T-1 |
132/11 |
31.5/40 |
2008 |
22.03.2012 |
SIEMENS |
T-2 |
132/11 |
31.5/40 |
2008 |
05.11.2010 |
SIEMENS |
T-3 |
132/11 |
20/26 |
1305 |
28.02.2007 |
Toshiba |
| 41 |
132KV Sukh Chayan |
T-1 |
132/11 |
20/26 |
1305 |
17.03.2012 |
TBEA CHINA |
T-2 |
132/11 |
20/26 |
1305 |
17.03.2012 |
TBEA CHINA |
| 42 |
132KV Town Ship |
T-1 |
132/11 |
20/26 |
1305 |
14.09.1986 |
Toshiba |
T-2 |
132/11 |
31.5/40 |
2008 |
28.03.2010 |
SIEMENS |
T-3 |
132/11 |
20/26 |
1305 |
29.05.1996 |
SIEMENS |
T-4 |
132/11 |
31.5/40 |
2008 |
29.10.2010 |
SIEMENS |
| 43 |
132KV Walington Mall |
T-1 |
132/11 |
20/26 |
1305 |
10.03.2000 |
Shenbain China |
T-2 |
132/11 |
31.5/40 |
2008 |
20.09.2010 |
SIEMENS |
T-3 |
132/11 |
20/26 |
1305 |
26.03.2008 |
Iran-Transco |
| 44 |
132KV Wan Radha Ram |
T-1 |
132/66 |
30/37.5 |
328 |
25.04.2008 |
PAUWELS |
T-2 |
132/11 |
20/26 |
1305 |
05.08.2011 |
TBEA CHINA |
T-3 |
132/11 |
20/26 |
1305 |
24.11.2000 |
E/Putter |
RT-1 |
66/25 |
7.5 |
376 |
03.12.1994 |
Hack Bridge |
RT-2 |
66/25 |
5 |
251 |
09.10.1989 |
SIEMENS |
| 45 |
66KV Baseer Pur |
T-1 |
66/11 |
10/13 |
653 |
07.07.1996 |
ELPROM |
T-2 |
66/11 |
10/13 |
653 |
21.09.2006 |
ELTA POLAND |
T-3 |
66/11 |
15 |
787 |
21.07.2010 |
GANZ |
| 46 |
66KV Kangan Pur |
T-1 |
66/11 |
10/13 |
653 |
16.03.1979 |
ELPROM |
T-2 |
66/11 |
15/18.8 |
936 |
20.12.1994 |
GANZ |
T-3 |
66/11 |
7.5 |
396 |
14.10.2010 |
ASEA LEPPER |
|
|